Coastal Custom Builders

Anderson Residence

Framing · 36%
Updated 2 hours agoLive
2026 · 2:34 PMLatest
Framing
Partly cloudy · 28°F

Second floor walls are going up nicely. Crew is ahead of schedule. Trusses arrive Thursday. The view from the second floor is going to be incredible — you can see the harbor.

Phase Checklist

2/4
Second floor walls framed
Window openings framed
Roof trusses delivered
Sheathing started
2026 · 10:15 AM
Framing
Clear sky · 22°F
+2 more

First floor framing is complete. All load-bearing walls are in place and the inspector signed off on the floor system. Everything is looking great and we're right on schedule.

Phase Checklist

3/3
First floor walls framed
Load-bearing walls verified
Floor system inspected

Phase reached: Framing

January 30, 2026

2026 · 3:45 PM
Foundation
Overcast · 31°F

Foundation walls are poured and curing. Backfill is scheduled for next week. We applied the waterproofing membrane on the exterior — this will keep you dry for decades.

Phase Checklist

3/4
Foundation walls poured
Waterproofing applied
Drainage tile installed
Backfill complete
2026 · 11:00 AM
Site Work
Light snow · 25°F
+1 more

Excavation is complete. Footings are dug and forms are set. Ready for concrete pour tomorrow morning. Weather is looking cooperative.

Phase Checklist

3/3
Excavation complete
Footing forms set
Gravel base compacted

Selections

Kitchen Countertop

Kitchen

Ordered

Cambria Brittanicca Warm

Exterior Siding

Exterior

Ordered

James Hardie Board — "Arctic White"

Master Bath Tile

Bathroom

Selected

Marble hexagon mosaic — Carrara

Front Door

Exterior

On Order

Therma-Tru Classic Craft — Mahogany

Hardwood Flooring

Interior

Selected

White Oak 5" wide plank — natural

Documents

Building Permit #2026-0142

Permit · January 8, 2026

Foundation Inspection Report

Inspection · January 29, 2026

Floor Plan — Final Rev

Plans · December 15, 2025

Elevation Drawings

Plans · December 15, 2025

Change Orders

Add gas line to deck for future grill

January 22, 2026

+$1,850

Approved

Upgrade master shower to frameless glass

February 1, 2026

+$2,400

Approved

Punch List

Touch up paint — garage trim

Low priority

Open

Kitchen cabinet door alignment (pantry)

Medium priority

In Progress

Deck railing gap at north corner

Medium priority

Open